ALLAOUI Hamid


Détails :


Doctorat : Hybrid Flow Shop Scheduling with Maintenance ...





Publications :

• Revues internationales

ALLAOUI H., LAMOURI S., ARTIBA A., AGHEZZAF E.
Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan
International Journal of Production Economics, vol. 112, no. 1, pp. 161-167, ed. Elsevier, 2008
(go to journal)

ALLAOUI H., ARTIBA A., ELMAGHRABY S.E., RIANE F.
Scheduling of two-machine flowshop with availability constraints on the first machine
International Journal of Production Economics, vol. 99, no. 01-02, pp. 16-27, ed. Elsevier, 2006

ALLAOUI H., ARTIBA A.,
Two stage hybrid flow shop scheduling with availability constraints, Computers & Operations Research
Computers and Operations Research, vol. 33, no. 5, pp. 1399-1419, ed. Elsevier, 2006

ALLAOUI H., ARTIBA A., ELMAGHRABY S., RIANE F.
Scheduling two machine flow shop with an availability constraint on the first machine
International Journal of Production Economics, vol. 99, no. 01-02, pp. 16-27, 2005

ALLAOUI H., ARTIBA A.
Integrating simulation and optimisation to schedule a hybrid flow shop with maintenance constraints
Computers & Industrial Engineering, vol. 47, pp. 431-450, 2004

ALLAOUI H., ARTIBA A.
Two stage hybrid flow shop scheduling with availability constraints
Computers & Operations Research, vol. 33, no. 5, pp. 1399-1419, 2004

• Communications dans des colloques internationaux

ALLAOUI H., GENIN P., LAMOURI S.
Coordinating the product design and the supply chain design
International Conference on Industrial and Systems Management, Beijin (China), May 30th - June 2th, 2007

ALLAOUI H., ARTIBA A.,
A Hybrid Approach to Improve Decision Making Manufacturing Execution Systems (MES)
Logistique et Transport – LT’06, 30 avril au 2 mai 2006, Hammamet, Tunisie, 2006

ALLAOUI H., LAMOURI S., LEBBAR M.
A Robustness framework for a stochastic hybrid flow shop to minimize makespan
International Conference on Service Systems and Service Management (ICSSSM'06 - IEEE), Troyes, France, 2006

ALLAOUI H., LAMOURI S., ARTIBA A.,
Using Johnson’s Algorithm to approximate some flow shop scheduling problems with unavailability periods
INCOM’06, 17-19 Mai 2006, Saint Etienne, France, vol. 3, pp. 45-50, 2006

H. Allaoui, H. Artiba, A. El Mhamedi
Stochastic two machine flow shop scheduling with availability constraints to minimize the expected makespan
35th Conf. On Computers & Industrial Engineering, Istanbul, Turkey, Juin, 2005, 2005

ALLAOUI H., EL MHAMEDI A., KERMAD L.
Integration scheduling, maintenance and quality control to optimise the total production cost
Génie industriel, vol. 5, 2005

ALLAOUI H., ARTIBA A., AGHEZZAF E.
Scheduling jointly n jobs and preventive maintenance on two machine flow shop to minimize makespan
Industrial engineering and system management, 2005

ALLAOUI H., ARTIBA A., EL MHAMEDI A.
Stochastic scheduling of two machine flow shop with an availability constraint to minimize expected makespan
Computers and industrial engineering, vol. 1, pp. 93-98, 2005

ALLAOUI H., ARTIBA A., RIANE F.
Hybrid flow shop scheduling with availability constraints
Mechanical design and production, vol. 2, pp. 1249-1254, 2004

ALLAOUI H., ARTIBA A., LAMOURI S.
Integrating simulation and optimisation to schedule an hybrid flow shop with maintenance constraints
European conference on combinatorial optimisation (ECCO XVII 2004) Beyrouth, Liban,, 2004

RIANE F., SUBAI C., ALLAOUI H.
Maintenance basée sur la qualité : une approche fonctionnelle d'analyse multicritère
Génie industriel, vol. 3, 2003

ALLAOUI H., ARTIBA A., RIANE F., ELMAGHRABY S.
On scheduling of two machine flow shop with an availability constraint on the second machine
Multidisciplinary International Conference on Scheduling : Theory and applications, no. 1, pp. 279-290, 2003

ALLAOUI H., ARTIBA A., RIANE F., ELMAGHRABY S.
On the two machines flowshop with availability constraints
Industrial engineering and production management, vol. 1, pp. 118-132, 2003